Skip to main content

A little leaf clean up & Christmas decorating

The beginning of December is starting out a little milder than November was.
Jess & I took advantage of a warmer day to take some pics of the dogs for our Christmas card.  Theses are some of the out-takes.


They are a pair!
I also had fun decorating the porch.



We had enough rain & warmer weather so we were able to get out & do a better job of cleaning up the leaves.  It was very messy but we got most of it done.  I don't ever remember having so much snow before the leaves came off the trees!
Not sure if this is leaf blowing or snow blowing!!!!

I have decorations spread all over the sun room & Gilly is having a ball playing in them.

This is what she does all day long!


She also found the step ladder to be entertaining.....there isn't too much that she doesn't get into:)

I love putting this on the tree every year......the first ornament made by my first grandchild!
Okay, let's check out what this is!
The tree is only decorated with the bare minimum of unbreakable ornaments as I don't know if Gilly will try to climb it!

I had to make her a Christmas stocking💕


Love
 photo signature1_zpsfa5mmhqq.png

Comments

Popular posts from this blog

Designer "doggy uggs"

Poor Molly has been having a hard time already this winter with the snow. She has good size pads on her feet which are "webbed" like a lab's foot.  When she goes in the snow it builds up in between her pads & forms a hard piece of almost ice-like snow.  Then she holds her foot up for someone to pull it out.  I decided to make her her own boots. Jessica had spent the night here as we went to First night for new years....more on that later.....so we "googled" how to make dog boots & then modified it to work for Molly.  Keep in mind these were boots you could make in 10 minutes.  It took approx 10 mins to measure Molly's feet.  Two hours later here's the results I did decide to make her 2 for each foot figuring she would be like any typical kid & lose a couple here & there. We had to go to W*lmart in the middle of the project to get velcro to make the fasteners.  We then made her wear them around the house for a while ...

Sewing, weaving & emptying the waterbed

 Monday morning began bright & early as we needed to finish emptying our bedroom.  Mark was dropping LiLi off before 8:00am as she does not have school this week.  We needed to drain the waterbed before we could take it apart.  As usual we were having no luck getting the water to siphon out & even resorted to having LiLi (all 35lbs of her) sitting on it with us!!  It probably took over an hour & who knows how many tries before it worked.  Got the mattress out & discovered the decking was falling apart.....good thing we decided to do this project,,,,I was able to find a local place so we can just replace it & to be safe I also got a new safety liner & heater.  I don't want to be doing this again for a while!  While Popster worked on replacing the baseboard & window trim in those two rooms LiLi & I started working on this doll kit she had gotten for her birthday.  All the pieces needed to be sewn togeth...

C of O ....Sun Room...Day Twenty Three-Twenty Five

This came in the mail today which made me realize I never posted the last couple days updates.  They really all rolled into one as Jim ended up leaving at noon on Weds...it started to snow & didn't work at all on Thurs.  Friday he finished things up by lunch time but had to spend the afternoon emptying my garage of all his tools.  We had our inspection on Monday which wasn't a problem.  It has been so sunny this week so far so it is so nice to sit in there & enjoy the view!  Yes Molly hangs out in her a lot.....I have nose prints to prove she looks out of all the windows!